Highest quality standards are achieved through the implementations of latest technology, decades of experience and everlasting moral values , which have helped us to retain our customers as well as multiply them.
The projects involves developing a container handling facility comprising of berthing/mooring facility for 3000 DWT barges and a stationary crane for handling containers. The facility is spread over an area of 100,00 Sq Mts. (The stationary crane has capacity of lifting 40t container at radius of 30m.)
The Project involves development of New breakwater of 630 Mts long and mole of 230 Mts in length, Berth for iron ore vessel of dimensions 380 Mts X 28 Mts with facilities for mooring, docking and unloading of capsize vessels, Two barge berths, each of dimension, 338 Mts X 22 Mts with facilities for mooring, docking and unloading of 3000 DWT barges. 14 Hectares of land is planned to be reclaimed for backup area which houses stacker-reclaimer, wagon tippler, conveyors etc. Spectrum has provided Pre-Bid Services for the project.
Project involves detailed design of 45 m long and 11 m wide wet dock where boats will be lifted by crane of 200 t capacity. The crane is running on tangent pile wall of wet dock. 50m long transfer yard is in continuation to the wet dock where boats will be unloaded on to the trailer for onward transmission to repairing facilities and Vice Versa after Repairs.
* To embrace new technologies and methods. * To give unsurpassed products and services to the clients. * To constantly look for improvement and changes.